What Is a Green Field Industrial Project?

A green field project starts from scratch - vacant, undeveloped land with no existing structures, utilities, or infrastructure. Everything must be built from the ground up: site access roads, compound walls, drainage, water supply, electrical connections, the building itself, and every system within it.

This is where the true capability of an end-to-end solution provider becomes critical. Unlike brownfield projects where existing infrastructure provides a starting point, green field developments require comprehensive expertise across every discipline of industrial construction.

With over 40 years of EPC experience and 60+ completed projects, Somappaa Infraa has the proven capability to take any green field site and transform it into a fully operational production unit or warehouse.

The Green Field to Production Journey

Every successful green field project follows a structured sequence of phases. Here is how Somappaa Infraa approaches each stage:

Phase 1: Site Survey & Feasibility

Topographical survey, soil investigation, environmental assessment, and feasibility study to validate the site for the intended industrial use.

Phase 2: Statutory Approvals

Building permits, environmental clearances, fire NOCs, factory licences, and all regulatory compliance handled by our statutory services team.

Phase 3: Engineering Design

Complete architectural, structural, MEP, HVAC, electrical, and production layout design - all coordinated under one design authority.

Phase 4: Site Development

Land levelling, compound wall, access roads, storm water drainage, water supply, and temporary construction facilities.

Phase 5: Construction

Foundation works, structural erection (civil or PEB), roofing, cladding, industrial flooring, and ancillary buildings.

Phase 6: Systems Installation

Complete electrical, MEP, HVAC, fire protection, and ELVS installation, tested and commissioned for production readiness.

Civil Construction: Building the Foundation

The civil construction phase establishes the physical foundation of the entire facility. Somappaa Infraa uses advanced construction methods that ensure speed, quality, and cost efficiency:

Self-Loading Mixers and On-Site RMC Plants

For green field projects - which are often located in industrial zones away from urban concrete suppliers - self-loading mixers and on-site RMC plants are essential. These systems provide:

On-Site Testing Laboratories

Somappaa Infraa establishes on-site testing laboratories at every major project site. These labs perform:

Real-time test results enable immediate corrective action, ensuring every element of the structure meets design specifications.

PEB Structures with Automatic Beam Forming

For industrial buildings requiring large clear spans and rapid erection, Somappaa Infraa uses PEB (Pre-Engineered Building) structures manufactured with automatic beam forming techniques. These factory-fabricated structural components arrive on site ready for assembly, dramatically reducing erection time compared to conventional steel structures.

Learn more about how modern PEB designs optimise production line layouts.

Industrial Flooring: The Production Surface

The factory floor is arguably the most critical surface in any production facility. Its flatness, strength, and durability directly impact equipment performance, material handling efficiency, and worker safety. Somappaa Infraa delivers industrial-grade floors using three advanced techniques:

Laser Levelling Systems

Laser-guided screeding systems produce floors with precise flatness and levelness tolerances (typically FF50/FL30 or better). This level of precision is essential for:

Ride-On Trowels

Ride-on power trowels are used for finishing large floor areas efficiently. These machines produce a dense, smooth surface finish that is:

Floor Densification Methods

After trowelling, chemical floor densifiers and hardeners are applied to the concrete surface. This densification process:

Combined impact: Laser levelling + ride-on trowelling + floor densification produces an industrial floor that is flat, durable, dust-free, and maintenance-friendly - the ideal surface for any production environment.

Electrical, MEP, HVAC & ELVS Systems

A production unit is not complete until all its building systems are installed, tested, and commissioned. Somappaa Infraa provides complete system installations as per client requirements:

Electrical Systems

MEP (Mechanical, Electrical, Plumbing)

HVAC (Heating, Ventilation & Air Conditioning)

ELVS (Extra Low Voltage Systems)

Industries and Warehouses We Build

Somappaa Infraa's end-to-end capabilities serve virtually every industrial sector:

No matter the industry, Somappaa Infraa delivers complete facilities tailored to your specific production requirements - from green field land to a fully operational unit. As a one-stop turnkey EPC contractor, every aspect of the project is managed under one roof.

Why Choose an End-to-End Solution Provider?

Building a production facility from green field involves dozens of specialised activities. An end-to-end solution provider like Somappaa Infraa offers distinct advantages:

  1. Single accountability: One contract covers everything from soil testing to system commissioning
  2. Integrated design: Structure, MEP, HVAC, electrical, and production layout are designed together, eliminating conflicts
  3. Faster delivery: Parallel execution and pre-fabrication compress project timelines significantly
  4. Quality consistency: One quality standard applied across all trades and systems
  5. Cost predictability: A comprehensive scope eliminates surprise costs and change orders
  6. Proven experience: With 60+ completed projects and 10 lakh+ sq ft delivered, Somappaa Infraa has the track record to deliver your project successfully